Week of June 2: We’re at the beginning of the end. This week, trim outs continued (Trim out = the final stage of adding the finishing touches to a house; basically a lot of folks coming back to finish what they started)!
Milestones:
- Plumbing trim out
- HVAC trim out
- Electrical trim out started











Up Next:
- electrical inspection + set meter to house and get start ups done
- begin painting once the house is lit and temp controlled
- grading work + maybe concrete